Journal Entry

Tuesday 9 June 2026

← DashboardAI Processed

Entry ID

dbe667b0-77e7-4c06-916e-3874d049ba38

Daily Report (Agent 1)

hse

No incidents reported

qaqc

None reported

notes

Client instruction received verbally. Super has flagged potential variation. Recommend immediate VIRF generation and PM review of scope.

delays

No delay reported

entry date

2026-06-09

project id

9c85ac41-a317-4364-bae2-4f1167656cc4

scope issues

Out-of-scope works flag raised. Superintendent noted uncertainty regarding whether client instruction constitutes a variation.

plant summary

Digger: 7.0h active, 1.0h idle

progress status

On track

works performed

Excavating culvert

personnel summary

1× Super (W, 8.0h), 1× Op (S, 8.0h) — Total: 2 crew

decisions required

Angie Doyle site visit regarding digger relocation — contractual status to be confirmed by PM

client interactions

Angie Doyle (Client Representative) attended site at 19:55 and verbally instructed crew to relocate digger for additional works. Instruction recorded but contractual status unclear (potential variation).

Detected Events (8)

highvirfVIRF

Verbal instruction received from Angie Doyle (Client Representative) at 19:55 to relocate digger and perform alternate work. Supervisor notes scope status is uncertain ('might be a variation I'm not sure'). Instruction diverted plant from programmed culvert excavation works.

Recommended Action

Generate VIRF immediately documenting: (1) Client representative name: Angie Doyle, (2) Time: 19:55, (3) Instruction: Relocate digger for alternate work, (4) Impact: 1.0h digger idle/redeployment, diversion from programmed culvert works, (5) Scope status: Uncertain — flagged for PM determination. Attach VIRF footer reserving rights to claim cost/time. Obtain PM confirmation of variation status within 24 hours.

highscopeVIRF

Out-of-scope flag raised by supervisor. Client instruction to relocate digger and perform alternate work — supervisor uncertain whether instruction falls within contract scope or constitutes variation. Out-of-scope field marked as 'true' in journal entry.

Recommended Action

PM to urgently review contract scope and determine: (1) Is digger relocation and alternate work within contracted scope? (2) If out-of-scope, initiate formal variation process immediately. (3) Instruct site team on classification and record-keeping requirements. (4) If variation confirmed, prepare variation claim capturing: plant redeployment cost, delay to programmed culvert works, and any associated preliminaries. Flag to commercial team for tracking.

highvirfVIRF

Verbal instruction received from Angie Doyle (Client Representative) at 19:55 on 09/06/2026 to relocate digger for additional works. Superintendent uncertain whether instruction constitutes a variation to contract scope.

Recommended Action

Generate VIRF immediately. Document instruction details, time, and person giving instruction. Engage PM to assess whether works fall within contract scope or constitute a variation. Do not proceed with additional works until scope clarification obtained and variation approved if required.

highscope

Out-of-scope works flag raised. Superintendent has identified potential works outside contract scope in relation to client instruction to relocate digger. Contractual status uncertain.

Recommended Action

PM to review contract scope immediately. Determine whether digger relocation and associated works fall within contractual obligations. If out of scope, prepare variation proposal with cost and time impacts. Do not proceed until scope determination made and client approval obtained if variation required.

highcommercial

Client Representative (Angie Doyle) directed works of uncertain contractual status. Superintendent unable to determine if instruction represents variation or falls within existing scope.

Recommended Action

Immediate commercial review required. PM and contracts team to assess instruction against contract scope, pricing schedule, and program. If variation, quantify cost and time impacts and submit to client for approval before proceeding. Ensure VIRF is issued regardless of scope determination to protect contractual position.

lowplant_idle

Digger recorded 1.0h idle/unproductive time (7.0h active of 8.0h available). Idle time attributed to client-instructed relocation to alternate work area per Angie Doyle's verbal direction at 19:55.

Recommended Action

Track idle time against client instruction VIRF. If scope review confirms variation, include 1.0h digger idle/redeployment cost in variation claim. Monitor ongoing efficiency — if alternate works continue, ensure accurate daily recording of plant utilisation and attribution to client instruction. No immediate action required beyond VIRF linkage.

lowplant_idle

Digger recorded 1.0 hour idle time during 8-hour shift while excavating culvert. Idle time coincides with client instruction to relocate plant.

Recommended Action

Monitor plant utilisation. If idle time relates to client-directed relocation, ensure time is captured in variation claim if works determined out of scope. Document any further idle time associated with this instruction.

mediumcommercial

Potential unrecorded variation event. Client instruction diverted digger from programmed works (culvert excavation) to alternate task. Plant utilisation impacted: 1.0h lost to relocation/idle time. Programmed activity interrupted. Supervisor notes uncertainty on variation status — commercial risk if not captured.

Recommended Action

Commercial team to: (1) Review VIRF and determine if variation claim warranted, (2) Calculate cost impact: digger standing/redeployment cost, labour inefficiency, delay to culvert program, (3) Cross-reference contract scope documents, (4) If variation confirmed, prepare claim documentation within contractual notice period, (5) Monitor for follow-on delay impacts to culvert completion. Ensure site team captures all time/cost associated with instructed alternate works going forward.

Commercial Letter Draft

VIRFRE: [Project Name] — Verbal Instruction Record Form — Digger Relocation

Dear Sir/Madam, We refer to verbal instructions received from your Client Representative, Ms Angie Doyle, on 9 June 2026 at 19:55 hours regarding the relocation of excavator plant from programmed culvert excavation works. Ms Doyle instructed our site team to relocate the excavator and perform alternate works. This instruction resulted in the diversion of plant from the scheduled culvert excavation program and caused 1.0 hour of idle/redeployment time during the transition. Our site Superintendent has advised that the contractual status of these instructed works is uncertain, and it remains unclear whether the works fall within the existing contract scope or constitute a variation to the contract. We hereby put the Principal on notice that the Contractor reserves its rights to claim additional cost and/or time associated with these instructed works, pending clarification of their contractual status. The impacts may include but are not limited to: - Plant idle time and redeployment costs - Delay to programmed culvert excavation works - Associated preliminaries and labour inefficiencies We respectfully request urgent confirmation from the Principal regarding whether these works are considered within the existing contract scope or require formal variation approval before proceeding further. This record is made to document verbal instructions given by the Client Representative. The Contractor reserves the right to claim additional cost and/or time associated with compliance with this instruction. Yours faithfully, [Contractor Representative]

VIRF-008 created — View on Variations page

From the Field — Operator Entries

Submitted by operators for Tuesday 9 June 2026 via Timekeeper.

No operator entries for this date yet.

Hours submitted from the field will appear here automatically.

Captured in Timekeeper by the operator on site. Approve to sign the hours off; amend to correct them — the operator's original submission is always kept alongside. Releasing locks a timesheet and feeds the pay-period summaries. Operators are managed in Timekeeper.

Progress vs Program

On Track

Cause of Any Delay

Reason
No delay

Resources

All resources available?
Yes

Personnel on Site

NameRoleHours
Wayne CorriganSupervisor8
Brett HalvorsenOperator8

Plant on Site

ItemActive hIdle hBrkdn
Digger7N

Works Performed

Works
Excavating culvert

Out-of-Scope Works

Yes

Client Instructions

Yes
Given by
Angie Doyle
Time
19:55:00
Instruction
Yeah Angie asked us to go and move the digger to do something else not a variation or might be a variation I'm not sure

HSE

No

Decisions & Discussions

Yes see above with Angie coming out and talk to us about the digger

Created 09/06/2026, 11:55:49 am