This project is not flagged as on a WA mine site. Handovers will be generated as quality records.
This value cannot be edited at this stage. Contact support if the project was misclassified.
No journal entry today — last entry 2 June 2026
No entry today
Last entry: 2 June 2026
View all →
All VIRFs confirmed
View all →
1 items · 0 active
2 incidents recorded
Near miss
Tag line came loose during WTP tank lift, no contact made, crew clear. Lift halted immediately by crane operator, toolbox and procedure review held on-site, incident report to be raised.
28 Apr 2026
hse
Near miss incident during WTP tank lift at approximately 1015hrs on 28 April 2026. Tag line came loose from tank while being guided into position. No contact made with personnel or equipment. Crane operator halted lift immediately. All crew stood clear in time. Toolbox talk conducted on-site immediately following incident with all riggers to review tag line procedures. No injuries sustained.
View all →
All confirmed in writing
View all →
SWMS Agent coming soon
Agent 3 not yet built
SWMS expiry tracking will be available once Agent 3 is deployed.
0.00 h released — no labour budget entered
As at 2026-08-14 · contract window unavailable
Contract start and finish are not both set, so there is no duration to spread the budget over. Hours below are correct; variance cannot be computed until the contract window is set in Project Settings.
Project SettingsNo labour budget lines and no timesheets on this project yet. The read succeeded — this is an empty record, not a failure.
0.00 h released — no plant budget entered
As at 2026-08-14 · contract window unavailable
Contract start and finish are not both set, so there is no duration to spread the budget over. Hours below are correct; variance cannot be computed until the contract window is set in Project Settings.
Project SettingsNo plant budget lines and no plant lines on any timesheet on this project yet. The read succeeded — this is an empty record, not a failure.