Builder of Camps Co — Mining Village

Iron Peak Resources Pty Ltd · BOC-2026-001

Standard project

This project is not flagged as on a WA mine site. Handovers will be generated as quality records.

This value cannot be edited at this stage. Contact support if the project was misclassified.

No journal entry today — last entry 2 June 2026

Program Health

No entry today

Last entry: 2 June 2026

Last entry2 June 2026
Total entries5

View all →

Variation Flags

All VIRFs confirmed

Pending0
Sent0
PM Approved0

View all →

Plant Utilisation

1 items · 0 active

StatusAll plant active

Site Events

2 incidents recorded

Near miss

Tag line came loose during WTP tank lift, no contact made, crew clear. Lift halted immediately by crane operator, toolbox and procedure review held on-site, incident report to be raised.

28 Apr 2026

hse

Near miss incident during WTP tank lift at approximately 1015hrs on 28 April 2026. Tag line came loose from tank while being guided into position. No contact made with personnel or equipment. Crane operator halted lift immediately. All crew stood clear in time. Toolbox talk conducted on-site immediately following incident with all riggers to review tag line procedures. No injuries sustained.

View all →

Client Instructions

All confirmed in writing

StatusAll verbal instructions confirmed

View all →

Document Expiry

SWMS Agent coming soon

Agent 3 not yet built

SWMS expiry tracking will be available once Agent 3 is deployed.

Labour Hours — Budget vs Actual

0.00 h released — no labour budget entered

As at 2026-08-14 · contract window unavailable

Contract start and finish are not both set, so there is no duration to spread the budget over. Hours below are correct; variance cannot be computed until the contract window is set in Project Settings.

Project Settings

No labour budget lines and no timesheets on this project yet. The read succeeded — this is an empty record, not a failure.

Plant SMU Hours — Budget vs Actual

0.00 h released — no plant budget entered

As at 2026-08-14 · contract window unavailable

Contract start and finish are not both set, so there is no duration to spread the budget over. Hours below are correct; variance cannot be computed until the contract window is set in Project Settings.

Project Settings

No plant budget lines and no plant lines on any timesheet on this project yet. The read succeeded — this is an empty record, not a failure.